How Long Should a Roof Repair Take in Winter Conditions?
How Long Should a Roof Repair Take in Winter Conditions?
What to Expect From a Cold-Weather Roofing Timeline
Roof repairs in the winter can take a bit longer—but with the right planning, most fixes can still be completed quickly and safely.
Here’s what to expect from a cold-weather roofing repair timeline in the Quad Cities.
🧯 Emergency Repairs Can Be Immediate
For leaks, punctures, or storm damage:
Tarping can be done the same day
Spot sealing of leaks is usually within 24–48 hours
Temporary repairs are installed safely until permanent work is scheduled
We prioritize emergencies and will stabilize the roof even in snow.
🔨 Minor Repairs: 1–2 Days
Replacing a few shingles or resealing flashing typically takes:
1–2 days, weather permitting
Additional time for drying/sealing in low temps
Slight delays if snow removal is required first
Crews work shorter daylight hours, so the same job may span 2 days instead of 1.
🛠️ Structural or Full-System Repairs: 3–7 Days
Larger jobs involving:
Decking replacement
Chimney or skylight rebuilds
Extensive flashing upgrades
…can take 3–7 days based on weather, material delivery, and safety factors.
❄️ What Can Delay Winter Repairs?
Ice or snow that must be cleared
Frozen sealant or shingles
Windchill or unsafe working temps below 20°F
Our team monitors forecasts to schedule during ideal weather windows.